上部地山の切土による既設トンネルの変形挙動
小島 芳之朝倉 俊弘吉川 和行重田 佳幸土屋 敬中川 浩二
著者情報
ジャーナル フリー

2003 年 52 巻 8 号 p. 958-965

詳細
抄録
To establish an adequate evaluative method of existing tunnel deformation behaviors due to ground surface excavation above the tunnels, case studies of 23 tunnels' field measurement data and numerical parametric analyses using two dimensional FEM have been conducted. To sum up the contents; 1) Cracking of tunnel lining are roughly found in cases of the final/initial overburden ratio h/H<0.2-0.3 (h: final overburden, H: initial overburden). 2) Tunnel deformation behaviors consist mainly of B/2 (h+D) (B: excavation width, D: tunnel diameter), lining rigidity, ground rigidity, contact condition between ground and tunnel lining, and ground initial stress K0.