鋼構造論文集
Online ISSN : 1884-0329
Print ISSN : 1880-9928
ISSN-L : 1880-9928
銅製橋脚基部の超低サイクル疲労破壊挙動
坂野 昌弘三上 市藏村山 弘三住 泰久
著者情報
ジャーナル フリー

1995 年 2 巻 8 号 p. 73-82

詳細
抄録
Since the number of excessive seismic loading cycles is observed to be less than ten, such very short term loading experiments are conducted to investigate the super - low - cycle fatigue behavior of steel pier base joint. Cracks are initiated in such an early stage as the second cycle at the inter section of a longitudinal corner weld between a column flange and a column web and a transverse fillet weld between a column flange and a base plate, and prop agated to fracture a flange plate rapidly after corner welds are broken. The crack initiation life can be evaluated by means of elasto - plastic finite element analysis, using a cyclic stress-strain curve.
著者関連情報
© 社団法人日本鋼構造協会
前の記事
feedback
Top