博多湾の窪地埋戻しにおける環境対策を考慮した施工の効率化の検討
酒井 浩二渡辺 祐二佐藤 鉄志首藤 啓神尾 光一郎
著者情報
ジャーナル フリー

2013 年 69 巻 2 号 p. I_1371-I_1375

詳細
抄録

Sand and soil dredged during port improvement work has been returned to dredged trenches as backfill since 2011. Considering the coastal environment,construction work has employed the double pipe tremie process with a suspended turbidity barrier and monitoring of water cloudiness. To gauge the spread of turbidity,an on-site experiment was performed in which soil and sand were loaded into the water with no barrier,in 2012. In light of these findings and the circumstances of construction,it was thought that the suspended turbidity barrier could be replaced with a freestanding type. This would be an effective method as it would prevent the rise of sand and soil lifted up by work barges,render the task of setting up and removing the barrier unnecessary,and enable extension of the construction period.

著者関連情報
© 2013 公益社団法人 土木学会
前の記事 次の記事
feedback
Top