抄録
Usually, a system is gradually built by repetition of the correction based on the designer's capability and improvement. This system improvement method called a PDCA cycle is used for the problem of not only systems development but the world. In this paper, we examined the possibility of taking in a PDCA cycle in a curriculum. The possibility of curriculum construction has been checked. However, the appraisal method of capability and the effective relationship with other practical curriculum will pose a problem.