河川技術論文集
Online ISSN : 2436-6714
鉛直二重管吸引工法による排砂実験およびその排出土砂濃度の推定方法
前田 圭介庄路 友紀子太田 誠二
著者情報
ジャーナル フリー

2015 年 21 巻 p. 83-88

詳細
抄録

Currently, sediment removal method using suction pipe is researched as an effective method for discharge of accumulated sediment in dam reservoir. Vertical multi-holes double-pipes system is one of the method and has been researched for practical application in dam site. This paper shows the laboratory tests of the system and the verification of the result of the tests. Firstly, the laboratory tests by small model and nearly full-scale prototype system was carried out to check the suction ability. Secondly, the hydraulics model was constructed with results of the tests. Finally, the estimation method of discharging sediment concentration with the flow and the loss of pressure in the pipe has been developed.

著者関連情報
© 2015 土木学会
前の記事 次の記事
feedback
Top