砂防学会誌
Online ISSN : 2187-4654
Print ISSN : 0286-8385
ISSN-L : 0286-8385
報文
渓流環境の復元を目的に加えた治山事業の計画と施工 -茂倉沢における試み-
高橋 剛一郎井口 英道
著者情報
ジャーナル オープンアクセス

2012 年 64 巻 5 号 p. 24-31

詳細
抄録

The main part of a check dam installed in the Shigekurazawa, a tributary of the Tone River, was removed in November 2009. The dam was removed to restore the stream ecosystem and develop a new method and technology for stream conservation. Removal of a check dam in the ecological context was unique implementation in Japan. The stream is in the forest area of the Akaya Project, a project that has been conducted through discussion and collaboration among the Kanto Regional Forest Office, the Nature Conservation Society of Japan, and a council organized by the local people in order to recover the ecosystem of the area. The participants engaged in consultation with professionals regarding disaster prevention and specific ecological and engineering problems and designed a basic plan for engineering and monitoring based on the concept of adaptive management that was then executed by the Kanto Regional Forest Office. Forest conservation engineering conventionally focuses on disaster prevention; however, the current plan would give ecological contents in Japanese forest conservation plan and engineering.

著者関連情報
© 2012 社団法人砂防学会
前の記事 次の記事
feedback
Top