砂防学会誌
Online ISSN : 2187-4654
Print ISSN : 0286-8385
ISSN-L : 0286-8385
許容流砂量と砂防計画に関する考察
矢澤 昭夫水山 高久大場 章
著者情報
ジャーナル フリー

1986 年 39 巻 1 号 p. 3-9

詳細
抄録
Allowable sediment discharge is the sediment discharge wich is allowed to flow downstream through an outlet of an area conducted Sabo works. And the ifference between planned sediment discharge and the allowable sediment discharge is considered the sediment which should be checked with sediment control (sabo) structures such as sabo dams. Allowable sediment dischare has been defined differently by different persons. It, however, has not been explained clearly. Some river bed sediment discharge under various conditions, flood peak discharge, bed material size, sediment supply through the upstream end of an alluvial fan. It was made clear that; (1) It is possible to estimate allowable sediment discharge with the technique shown here. (2) Bed material size used in the calculation affects the result markedly. As the bed material size is expected to be smaller during large floods new landslides, debris flows and bank erosion. It is necessary to sample transported bed material during and just after floods.
著者関連情報
© 社団法人砂防学会
前の記事 次の記事
feedback
Top