Proceedings of the Annual Conference of the Institute of Systems, Control and Information Engineers
The 47th Annual Conference of the Institute of Systems, Control and Information Engineers
Conference information
Production system including a function to reassign in-process products to receipt order under a environment combined make-to-stock production and make-to-order one
2nd Report: Procedure to decide due-date of receipt order with scheduling and reassigning
Masahiro ARAKAWATakayuki OGINOMasahiko FUYUKIIchiro INOUE
Author information
CONFERENCE PROCEEDINGS FREE ACCESS

Pages 4029

Details
Abstract
A production system including a function to reassign in-process products to receipt order is developed in order to supply a customer with products with short lead time in previous paper. Then, effect of the reassignment on reduction of lead time of receipt order is investigated by utilizing the developed system. One of the problems that scheduling personnel have to resolve is that they show precise due-date of order to customer. However, it is difficult to estimate appropriate due-date of receipt order, because the exact number of orders received in the future is impossible to be predicted and schedule is continuously changed by addition of new receipt orders. In this paper, a procedure to decide due-date of receipt order with scheduling and reassigning is proposed. Then, the performance of the proposed procedure is evaluated on simple shop model.
Content from these authors
© 2003 The Institute of Systems, Control and Information Engineers
Previous article Next article
feedback
Top