Abstract
Resent semiconductor manufacturing feature is high-product-mix and small-lot-size production, and the productivity becomes worse owing to the short life cycle of goods and demand within a short time period. Therefore, to optimize the efficiency, cost, and TAT (Turn Around Time) in a comprehensive way is indispensable. In this paper we studied the effectiveness of applying Lagrange Decomposition and Coordination Method.