奥只見発電所超高圧屋外機器の雪害とその対策について
桑原 進
著者情報
ジャーナル フリー

1962 年 24 巻 6 号 p. 189-192

詳細
抄録

At Okutadami water power station we tried a measure to counter the accumulated snow on the outdoor E.H.V. electric apparatus by the experience of research and investment at Tagokura water power station located on the down stream of Okutadami site. However, owing to the difference of ambient temperature and quality of snow, the accumulated snow grew large like a mushroom on the electric apparatus, and freezed snow blocked the driving rod of line switches, so that the several damage such as mishap's to line switches and to shieldring of P.D and line switches occured.
The next winter, fitting up the driving mechanism with an electric heater and making the head of the shield cap round, we took the above apparatus on another test.
Oh the basis of the result we decided the capacity and setting position of the electric heater and the shape of the shield cap. We think this counter plan will have enough efficacy.

著者関連情報
© 公益社団法人 日本雪氷学会