Techinical Papers of Annual Meeting the Society of Heating,Air-conditioning and Sanitary Engineers of Japan
Online ISSN : 2424-2179
Print ISSN : 1880-3806
ISSN-L : 1880-3806
2005.1
Session ID : H-3
Conference information
H-3 A Case study of operational improvement in a large complex building : A chilled water supply demand control at a peak load
hideaki NAKAJIMAmasayuki NAKAMURAyasusi HATTORIiwao HASEGAWAmitsutoshi IDA
Author information
CONFERENCE PROCEEDINGS FREE ACCESS

Details
Abstract
A DHC (District Heating and Cooling system) provides chilled water and steam to a large complex building. The building owner is concerned about saving energy cost for the HVAC system. This paper presents the chilled water supply control method at a peak load in summer and the result of this control.
Content from these authors
© 2005 The Society of Heating,Air-Conditioning&Sanitary Engineers of Japan
Previous article Next article
feedback
Top