抄録
The results of validation of VAV and CAV systems in KTC (Kogakuin Twin Chambers) in summer of 2006 are dscribed. The simulated air conditioning load of the VAV system showed agreement with the measured data in general. For the CAV system, the cooling coil, the results showed the similar variations except for the period with a defect in controlling.