抄録
In an indoor speed skating arena completed in Obihiro-city, in charge of heat between big arena and room environment inspection duties to relate to moisture. There are many problems to a design and performance inspection after the completion here. Carried out some kind air flow simulation of big arena and measured of long-term temperature and humidity and energy consumption, continuing examination of promotion of efficiency sake of reduction and water use.