1105 A Study of the Relationship Between Risk Driver and Risk Check List in IT Project
Mikiko Sawada
Author information
CONFERENCE PROCEEDINGS OPEN ACCESS

Details
Abstract
There is a particular model which figures fundamental risk causes and make planning resolutions possible. Risk drivers, which are the components of the model, are something existing in the project environment that leads us to believe that a particular risk event/impact occurs. In IT project, using risk check list is effective to realize such risk drivers.