Abstract
Various problems occurred in development of the large scale system which makes a basis newly enacted law. the problems are, that specification is not decided, that immature offshore management went wrong, and not being completed by failure by a total test phase. It solved dramatically by having coped with it variously. I introduce the process and it shows the teachings for harnessing in the systems development on and after next time.