Abstract
As the semi-conductor device process has recently been drastically changed, the requirements on the device manufacturing tools have also changed. Although only the best data of unit process was required so far, the module solution and/or total solution using e-manufacturing are now required. It is herein reported that the method of the project management was applied in the development of the manufacturing tools for damascene process such as electro plating, CMP, cleaning and those total design.