原子力発電所の定期安全レビューの実効性向上に関わる研究
山本 晃弘 関村 直人
著者情報
ジャーナル フリー

2018 年 17 巻 2 号 p. 67-85

詳細
抄録

 The Periodic Safety Review (PSR) is a continuous safety enhancement process to improve overall plant safety. The report on the Fukushima Daiichi accident issued by the IAEA indicated that the approach to PSR in Japan was not fully in line with guidance from the IAEA. PSR was originally an efficient means of improving the safety level of installations, and to make a decision on the continuation of the reactor operation for the next decade. In order to achieve the objectives of PSR, plant operators need to review their operating experience as well as reassess their past review and identify findings which lead to improvements of plant safety. It is also important that regulators participate in the preparatory work of the review to identify the issues and the outcome of the review. To improve the efficiency and effectiveness of this activity, the regulators need to develop a technical information base reflecting the safety inspection carried at the sites to identify issues. The plant operator also needs to reassess the past PSR to verify the validity of the review. Regulators and plant operators should continue to make bilateral efforts through PSR and deliver improvements of safety throughout the plant life.

著者関連情報
© 2018 一般社団法人 日本原子力学会
前の記事 次の記事
feedback
Top