高温ガス炉ガスタービン発電システム(GTHTR300)の経済性評価
武井 正信小杉山 真一毛利 智聡片西 昌司國富 一彦
著者情報
ジャーナル フリー

2006 年 5 巻 2 号 p. 109-117

詳細
抄録
Japan Atomic Energy Research Institute (JAERI) has been developing a graphite moderate and helium cooled High Temperature Gas-cooled Reactor (HTGR) with gas turbine, the GTHTR300 based on experience gained in development and operations of the High Temperature Engineering Test Reactor (HTTR) in JAERI. The GTHTR300 is a simplified and economical power plant with a high level of safety characteristics and a high plant efficiency of approximately 46%. Cost evaluation for plant construction and power generation is studied in order to clarify the economical feasibility of the GTHTR300. The construction cost is estimated to be about 200 thousands Yen/kWe. The power generation cost is estimated to be about 3.8Yen/kWh by the conditions of 90% load factor and 3% discount rate. The economical feasibility of the GTHTR300 is certified. The present study is entrusted from Ministry of Education, Culture, Sports, Science and Technology of Japan.
著者関連情報
© by the Atomic Energy Society of Japan
前の記事 次の記事
feedback
Top