鉄と鋼
Online ISSN : 1883-2954
Print ISSN : 0021-1575
ISSN-L : 0021-1575
論文
多点探索貪欲法を用いた鉱石ヤード山配置計画の最適化
熊野 徹 吉成 有介山口 収宮沢 徹
著者情報
ジャーナル オープンアクセス HTML

2023 年 109 巻 11 号 p. 857-864

詳細
抄録

We have developed an optimal scheduling method for the highly efficient management of multiple stockpiles of iron ore in the stockyard to significantly improve both yard logistics and the operational stability of steelworks.

The ore stockyard layout problem is to make inventory schedules for the purpose of cost minimization under several constraints such as uptime of facilities. While the number of stockpiles generally must be minimized for efficiency, excessive minimization can raise the risk of undelivery of iron ore if the required transport equipment become unavailable due to daily maintenance or a mechanical problem. The key, therefore, is to devise a plan that realizes both efficient yard operations and stable steelworks operation.

In response, we developed Stockpile Layout Planner which optimizes yard operations by creating ideal plans for up to several months with multi-start Greedy based algorithm that completes complicated logistical calculations in less than one minute. The new method ensures that such logistics are handled efficiently to realize highly stable ore management.

Fullsize Image
著者関連情報
© 2023 一般社団法人 日本鉄鋼協会

This is an open access article under the terms of the Creative Commons Attribution-NonCommercial-NoDerivs license.
https://creativecommons.org/licenses/by-nc-nd/4.0/
前の記事 次の記事
feedback
Top