日本機械学会論文集
Online ISSN : 2187-9761
ISSN-L : 2187-9761

この記事には本公開記事があります。本公開記事を参照してください。
引用する場合も本公開記事を引用してください。

ナトリウム冷却型高速炉配管のLBB評価に対する荷重条件の提案と配管パラメータの影響
矢田 浩基高屋 茂若井 隆純仲井 悟町田 秀夫
著者情報
ジャーナル フリー 早期公開

論文ID: 17-00389

この記事には本公開記事があります。
詳細
抄録

In the in-service inspection of sodium cooled fast reactors, an examination by continuous leak monitoring will be applied for components constituting sodium boundaries. The continuous leak monitoring examinations are premises in a LBB (leak before break) being established. In previous LBB evaluation, the axial crack of the elbow flank has been evaluated, because in the piping system of the fast reactor with high thermal expansion, high stress is generated in the elbows flank. However, the LBB evaluations for circumferential cracks are important in the point of continuous leak monitoring in the in-service inspection. In this study, the load conditions in the LBB assessments for circumferential cracks were examined and LBB characteristics of class 1 pipes of the prototype fast breeder reactor "Monju" were evaluated as an example. Additionally, in order to research the relationship between pipe condition and LBB, many pipes were evaluated with actual conditions. As results, following conclusions were obtained. It was demonstrated that LBB characteristics are established at class 1 pipes in “primary heat transport system” and “cooling system for maintenance” of “Monju”. LBB characteristics are correlated with pipe diameter and thickness.

著者関連情報
© 2017 一般社団法人日本機械学会
feedback
Top