Innovation and Supply Chain Management
Online ISSN : 2187-8684
Print ISSN : 2187-0969
ISSN-L : 2185-0135
Volume 17, Issue 2
iscmvol17no2
Displaying 1-3 of 3 articles from this issue
vol17no2
  • Masamitsu KIUCHI, Kenichi NAKASHIMA
    Article type: research-article
    2023 Volume 17 Issue 2 Pages 81-87
    Published: June 30, 2023
    Released on J-STAGE: August 27, 2023
    JOURNAL FREE ACCESS
  • Yukio Maruyama, Yutaka Shirai, Hisashi Yamamoto
    Article type: research-article
    2023 Volume 17 Issue 2 Pages 91-96
    Published: June 30, 2023
    Released on J-STAGE: October 26, 2023
    JOURNAL FREE ACCESS

    Forecasting water demand is very important for pure water reservoirs because the amount of water supply to water supply stations cannot be changed frequently according to the variation in demand. The aim of this study is to propose a forecasting method for water demand applicable all over Japan. In our previous studies, we proposed three forecasting methods and one correcting method for water demand using data from four Japanese prefectures. These forecasting methods adopted the following three processes: (1) multivariate regression analysis, (2) using multiple year data of the amount of daily water supply, and (3) correcting the obtained multivariate regression formula by single regression analysis. The results showed that the proposed forecasting methods ’precision was approximately 2%. However, the forecasting precision could not be improved further. Thus, this study focuses on correcting the method and forecasting error. In our previous studies, the correcting method that was proposed by using a single regression analysis consisted of the following three steps: (1) temporary forecasting values were calculated by obtained multiple regression formula using daily water supply data close to the forecasting day; (2) correcting coefficients were estimated by a single regression analysis using the relation between temporary forecasting values and actual amounts; and (3) the multiple regression formula was corrected using the obtained correcting coefficient. Thus, the proposed correcting method was very simple in our previous studies. In this paper, the factors of forecasting error are estimated based on the relationship between the forecasting and actual amounts. Then, the new correction method is examined using these factors.

    Download PDF (3035K)
  • Yutaka Shirai, Yukio Maruyama
    Article type: research-article
    2023 Volume 17 Issue 2 Pages 101-106
    Published: June 30, 2023
    Released on J-STAGE: October 26, 2023
    JOURNAL FREE ACCESS

    At present, because of diverse user needs, types and construction of products tend to be fractionated and complicated. Material handling costs at large-scale production facilities, regarded as an important factor, are said to account for about 15%–75% of all factory costs. Therefore, to achieve higher efficiency and lower production costs, conventional single floor buildings are being replaced by multi-floor buildings. Recently, when a new factory is designed, a few circular buildings are included in addition to rectangular buildings, which are still used frequently. Nevertheless, little development of multi-floor layouts has occurred for circular buildings. As the number of work sites at factories increase,the number of combinations of work sites (factory layout designs) is expected to increase exponentially. Therefore, a longer time is necessary for precise solutions using mathematical programming. Finding an optimal solution within a realistic calculating time is difficult. Therefore, to obtain a nearly optimal layout that approximates the best solution with high accuracy, some optimization method (meta-heuristic) must be used. For this study, a technique to produce a layout for a rectangular building and a circular building for a multi-floor factory using genetic algorithms (GAs) is used as one optimization method. The building shape is then subjected to comparative examination. Productivity values obtained according to the building shape, as calculated by the total material handling costs between work sites, are compared using numerical experiments to clarify the effectiveness of layout techniques for rectangular buildings and circular buildings.

    Download PDF (562K)
feedback
Top