Journal of the Atomic Energy Society of Japan
Online ISSN : 2433-7285
Print ISSN : 1882-2606
Volume 53 , Issue 9
Showing 1-17 articles out of 17 articles from the selected issue
Preface
Exposition
From Abroad
  • Xu Mi, Yu Hong, Hu Yun, Chen Yiyu
    2011 Volume 53 Issue 9 Pages 633-637
    Published: 2011
    Released: September 06, 2019
    MAGAZINES FREE ACCESS

      The first criticality of the China Experimental Fast Reactor(CEFR)was reached on July 21,2010. The CEFR is the first step in fast reactor engineering development in China, which was launched in the framework of The National High-Tech Program. The design and construction timetable, the main design characteristics and the parameters of the CEFR are briefly introduced in the paper. Emphasis is placed on describing the criticality calculation tools and results before its physics start-up and then the physics start-up testing process and results are described. Finally some important experiments completed at the reactor criticality state are listed.

    Download PDF (1083K)
Seminar
Exposition
Exposition
ATOMOΣ Special
feedback
Top