日本建築学会技術報告集
Online ISSN : 1881-8188
Print ISSN : 1341-9463
ISSN-L : 1341-9463
建築計画
プレハブ住宅解体工事における作業量・排出材量の実態
岡村 卓麻角田 誠
著者情報
ジャーナル フリー

2007 年 13 巻 26 号 p. 695-698

詳細
抄録
Volume and variety of construction waste according to demolition were affected by both construction and demolition method. In the present circumstance, demolition processes were not considered building construction method at all. In this study, we grasped the influence of rationalization in construction method, which is prefabricated detached house, on demolition process. As a result, demolition of composite materials made in factory were required a great deal of time for separation. The necessity of mutual relationship contents of disposal and labor of separation were found out.
著者関連情報
© 2007 日本建築学会
前の記事 次の記事
feedback
Top