日本建築学会技術報告集
Online ISSN : 1881-8188
Print ISSN : 1341-9463
ISSN-L : 1341-9463
建築社会システム
超高層マンションの外壁等総合改修工事における足場仮設計画プロセス
藤木 亮介秋山 哲一奥澤 健一
著者情報
ジャーナル フリー

2009 年 15 巻 31 号 p. 929-934

詳細
抄録
This study analyzes the planning process of the scaffolding in the extensive renovations of the high-rise condominiums. As the result of the analysis, the following items were clarified.
· It is preferable to accept some opinions of the constructors to the scaffolding plan.
Therefore the planner should devise the method of accepting some opinions of the constructor at the plan stage of the scaffolding plan.
· Not only the gondola scaffolding but also the prefabricated scaffolding are effective in respect of construction expense.
These results will be important reference items in the maintenance of the high-rise condominiums.
著者関連情報
© 2009 日本建築学会
前の記事 次の記事
feedback
Top