抄録
A questionnaire survey was conducted to the inspectors, aiming to confirm the situation of inspection of the bar splice.
According to the answers of the questionnaires, about 50% inspectors had the experience that were not able to specify inspection.
It is important that the inspection schedule should be correctly built into the construction process, for the good quality of bar splice.