AIJ Journal of Technology and Design
Online ISSN : 1881-8188
Print ISSN : 1341-9463
ISSN-L : 1341-9463
Architecture System and Management
RENOVATION AND EXTENSION OF BUILDING THAT DON’T HAVE A CERTIFICATE OF INSPECTION AND PROBLEMS THAT AROSE IN THE PROCESS
- Through the case of A house at Sendai City -
Ichiro YONESHIMA
Author information
JOURNAL FREE ACCESS

2025 Volume 31 Issue 77 Pages 532-537

Details
Abstract

Use of building stock are increasing. but a few people use building stock that don’t have a certificate of inspection. Ministry of Land, Infrastructure and Transport established guidelines, but people don’t actively design it. In this paper, I describe the following 3 points about design it. 1 I report on the contents of the investigation for material investigation, actual measurement investigation, and structural investigation. 2 I report the design of it with EV extension. 3 I report design process of it and a problem that have happened. How design it will continue to be an important issue in the future.

Content from these authors
© 2025, Architectural Institute of Japan
Previous article Next article
feedback
Top