Proceedings of the Eastern Asia Society for Transportation Studies
Vol.8 (The 9th International Conference of Eastern Asia Society for Transportation Studies, 2011)
会議情報

Practical Paper
Integrating Post-Evaluation into Project Cycle Management for Road Infrastructure Projects in Vietnam
Nguyen Van Cuong*Dinh Van Hiep
著者情報
会議録・要旨集 フリー

p. 56

詳細
抄録

In Vietnam, project cycle management (PCM) of road investment projects consists of investment preparation, implementation, construction, and operation processes. The post evaluation of projects during operation has not yet been considered through PCM in a systematic and effective manner. This paper discussed project management issues of road infrastructure projects in Vietnam. Then the paper introduced the post evaluation process for integrating into Vietnam PCM using the PCM methodology developed by Foundation for Advanced Studies on International Development (FASID). The National Highway No.5 Improvement Project was used as a case study for demonstrating applicability of the proposed procedure.

著者関連情報
© 2011 Eastern Asia Society for Transportation Studies
前の記事 次の記事
feedback
Top