Journal of the Eastern Asia Society for Transportation Studies
Online ISSN : 1881-1124
ISSN-L : 1341-8521
I: Traffic Accident and Safety
Speed Characteristics of Road Users in Work Zones on Indian Highways
Sumeet GUPTAGeetam TIWARI
著者情報
ジャーナル フリー

2013 年 10 巻 p. 2010-2020

詳細
抄録
The study examined Measures of Effectiveness (MOE) of vehicle speeds and its comparison with posted speed limits in Advance Warning Zone (AWZ), Working Zone (WZ) and Terminal Transition Zone (TTZ) on NH-8 in India. Results indicate that (1) Except slow moving vehicles, all the fast moving vehicles exceeded the posted speed limit of 40 km/h in AWZ and WZ; (2) 85th percentile speeds of Cars/Jeeps, Two-wheelers, Standard Trucks, Mini Trucks, and Buses are much higher than speed limit in AWZ and WZ; (3) mean speeds of fast moving vehicles are more than speed limit in AWZ and WZ; (4) there is no significant difference in the speed of vehicles in AWZ, WZ and TTZ at 95% confidence interval. This study strongly recommends the use of active traffic calming measures like Rumble Strips on Highway Work Zones.
著者関連情報
© 2013 Eastern Asia Society for Transportation Studies
前の記事 次の記事
feedback
Top