抄録
The connection flange of the FRP pipe, from the three-dimensional structure, cannot be a product formed without using the second processing method of molding a tube fabricated by arranging a unidirectional reinforcing fiber. This study reports the findings of a centrifugal forming method made possible 1 pc production in 10 minutes to 2 hours and not require secondary processing the ASA150 flange up to 3.5m from the minimum 50 mm.