Proceedings of International Association of P2M
Online ISSN : 2432-0382
ISSN-L : 2432-0382
2008 Spring
Session ID : D-1
Conference information

D-1 Approach of making to visible of requirements that ensures result acquisition of project
[in Japanese]
Author information
CONFERENCE PROCEEDINGS OPEN ACCESS

Details
Abstract
The primary aim of the project activity is a revolution activity to the mechanism of the value creation, and the evaluation is not an output but is a result thing of the project and result. It is thought that it is thought a cause fundamental communications shortage of management, the operations division, and the IT section in many cases, and it is indispensable that both share the purpose of the project to evade it though there is a case where the result that aims at first is not achieved by the IT project. The restriction and the confirmation of the note might be insufficient, RFP go out, and, in that case, the process called a grand design for the risk reduction to the result acquisition of the project is recommended. This paper overviews the meaning and the method of the risk minimization by making to visible of requirements through a grand design by the aspect of the system integrator.
Content from these authors
© 2008 International Association of P2M and Authors
Previous article Next article
feedback
Top