Proceedings of International Association of P2M
Online ISSN : 2432-0382
ISSN-L : 2432-0382
2018 Spring
Conference information

A Model for Effective Area of Hybrid Approach Combining Agile and Plan- Driven Methods in IT Project
*Takeomi IMANIMasaru NAKANO
Author information
CONFERENCE PROCEEDINGS OPEN ACCESS

Pages 49-64

Details
Abstract

Conventional, IT system development organizations have selectively utilized the two techniques: plan-driven method in which requirements are defined and baselined in early phase of the project and agile method which is based on iterative development. Recently, the research articles that reported a hybrid approach that uses plan-driven and agile method together have been on the rise. However, few theoretical studies have investigated the contextual conditions that illustrates a better fit for hybrid approach, called effective area. This research is aimed to provide an analysis model of hybrid approach by evaluating project characteristics and iteration development strategy. Our model and numerical simulations present that a hybrid approach should be fit with wider context of project characteristics than the agile method. By investigating the effective area with multiple parameters, this research would contribute to a growing literature of hybrid approach and a methodology for project manager or project management office to choose hybrid approach appropriately.

Content from these authors
© 2018 International Association of P2M and Authors
Previous article Next article
feedback
Top