Journal of Asian Architecture and Building Engineering
Online ISSN : 1347-2852
Print ISSN : 1346-7581
Regular Papers
Development of Risk Analysis Method for Building Projects
Tsung-Chieh TsaiShuzo FurusakaTakashi Kaneta
著者情報
ジャーナル フリー

2002 年 1 巻 2 号 p. 2_157-164

詳細
抄録
In the past decade, both inside and outside of Japan, a lot of studies and researches have been done on the problems concerning the risk management process, the contract relation, and the development of risk analysis technique. But, there are very few studies discussing the project risk from the viewpoints of jobsite engineers. Especially, risk management, which has been usually processed in the empiricism, is not considered deeply on the construction sites in Japan. However, it is necessary to understand the quantitative mechanism of project risk to proceed risk management in the construction site properly, and set up the risk strategies by trade-off of risk and cost to reduce the project risk. This study started with using FTA to develop a quantitative analysis method, and using the data from the stakeholders of project to prove this method is useful. And, 650 risk occurrence causes in concrete description were emerged in a discussion with 40 project managers by brainstorming. Then, 32 risk occurrence causes were extracted by the method of two-dimension evaluation. Finally, the decision support system of risk management in a dialogue way was developed.
著者関連情報

この記事は最新の被引用情報を取得できません。

© 2002 Architectural Institute of Japan
前の記事 次の記事
feedback
Top