1984 年 19 巻 p. 325-330
This paper deals with the frequency and characteristics of the site-combination in the built-up area. The results are as follows; the expansion of the road leads lots of sites to the site-combination. ; less than 40m sites almost combine with other sites. : there are tow types of the site-combination, positive one and negative one. and so on.