1985 年 20 巻 p. 199-204
When the land readjustment project is carried out in the densely built up area, it often occurs the problem of the lot size decrease. By corresponding the lots before the land readjustment project to the lots after that, I’ve come to the following conclusions: 1) More than 60% of the lots under 100m2 before the project ate readjusted into the lots over 100m2, 2) the small lots that composed one ‘Fude’ are easy to be integrated, 3) the small lot with building on it are difficult to change the land use or to be merged.