抄録
A Pyrolysis and melting process is drawing attention as the next-generation waste treatment technology that meets such demands. In 2000,the first fluidized-bed Pyrolysis and melting system for MSW (capacity : 30tons/day×2) was constructed at Cyubu-Kamikita Clean Center in Aomori prefecture, Japan and has been operated. The present paper gives a recent operation report and an outline of plant control system for the first fluidized-bed Pyrolysis and melting system, including dioxins emission.