年次大会
Online ISSN : 2424-2667
ISSN-L : 2424-2667
セッションID: S172025
会議情報
S172025 化学プラントの業務プロセスモデルに基づく変更管理の業務フロー([S172-02]化学装置の安全(2))
武田 和宏斉藤 日出雄角田 浩島田 行恭北島 禎二渕野 哲郎
著者情報
会議録・要旨集 フリー

詳細
抄録
For a chemical plant, changes caused by load fluctuation, transition of product markets, revamping of the plant's facilities, et al. are inevitable. Uncontrolled changes caused many accidents or disasters. Thus, management of change (MOC) has been a very important issue in process safety management. In this paper, it is considered that the MOC is divided to two parts: one is an individual change management and the other is a management of them. An individual change management is an instance of engineering over the plant lifecycle (Plant-LCE). A business flow of MOC is expected to be based on a business process model (BPM) of Plant-LCE. An overview for the BPM of Plant-LCE has been proposed. Using an individual change management example, this paper demonstrates that a business flow of the MOC can be described in the overview of the BPM of Plant-LCE. According to the results, importance of sharing information among design, operation and maintenance activities and requirement of supporting system for MOC and Plant-LCE were indicated.
著者関連情報
© 2013 一般社団法人 日本機械学会
前の記事 次の記事
feedback
Top