生産加工・工作機械部門講演会 : 生産と加工に関する学術講演会
Online ISSN : 2424-3094
セッションID: C30
会議情報
C30 エージェントを用いたFMSのための工程設計とスケジューリングの統合化システム(OS-4 生産システムとCAD/CAM(2))
Hossein TEHRANI杉村 延広岩村 幸治谷水 義隆
著者情報
会議録・要旨集 フリー

詳細
抄録
This paper deals with a multi-agent architecture of an integrated and dynamic system for process planning and scheduling for multi jobs. A negotiation protocol is discussed, in this paper, to generate the process plans and the schedules of the manufacturing resources and the individual jobs, dynamically and incrementally, based on the alternative manufacturing processes. The alternative manufacturing processes are presented by the process plan networks discussed in the previous paper, and the suitable process plans and schedules are searched and generated to cope with both the dynamic status and the disturbances of the manufacturing systems.
著者関連情報
© 2008 一般社団法人 日本機械学会
前の記事 次の記事
feedback
Top