論文
杭先端チャッキング式既存杭引抜き工法(PG工法)に伴う充填材注入に関する信頼性評価
稲積 真哉桑原 秀一中尾 晃揮境田 彰芳
著者情報
ジャーナル フリー

2020 年 69 巻 3 号 p. 204-209

詳細
抄録

The pulling out of existing pile is one of the critical issues in recent years with the aging of infrastructures, and it is difficult to clarify that the construction has been completely carried out because it cannot be directly observed. In recent years, two types of a wire rope type and a chucking type have been generally applied for pulling out existing piles. The chucking type is developed as a new method of the pulling out method to overcome the issues of the wire rope type for which impossible to pull out the damaged pile and the filling material cannot be injected from the deepest part at the same time. However, the pulling out methods is a method based on the rule of thumb, and it is not shown that the filling material surely shows its enough strength. Therefore, this research finds grounds for establishing the pile tip chucking type existing pile pulling out method, and statistically analyze the test results of the filler material samples collected after the construction of the chucking type existing pile pulling out method. The reliability of the pulling out method was evaluated.

著者関連情報
© 2020 日本材料学会
前の記事 次の記事
feedback
Top