The Aichi Synchrotron Radiation Center (AichiSR) was designed mainly for industrial use and entered public service on March 26, 2013. The 1.2 GeV storage ring works with 300 mA top-up operation mode since open for public use. In this paper, the performance of accelerators and present status of public use, especially industrial one are reported.