加速器
Online ISSN : 2436-1488
Print ISSN : 1349-3833
話題
KEKBクラブ空洞RFシステムのビームコミッショニング
赤井 和憲
著者情報
ジャーナル フリー

2008 年 5 巻 3 号 p. 227-236

詳細
抄録

KEKB started the first crab crossing operation in February 2007 with two superconducting crab cavities. After four months operation dedicated for machine tuning, physics run with high-current beams resumed in October with the crab crossing. The crab cavities have been working stably for one and a half years. The crab cavity RF system, commissioning process and performance of the crab cavities with high-current beams are presented.

著者関連情報
© 2008 日本加速器学会
前の記事 次の記事
feedback
Top