抄録
The dumping method of cubic blocks is investigated to optimize the construction works for artificial mound for occurrence of upwelling. In this method, four units of blocks are placed in a hopper and split barge, and two diagonal units are dumped in rotation. This paper presents the influence of number of block in a unit on deposition configuration of blocks and refers an acceptable dumping method in actual works.