河川技術論文集
Online ISSN : 2436-6714
御笠川流域におけるため池の治水効果
大八木 豊島谷 幸宏杉本 知佳子加藤 憲介朴 埼璨
著者情報
ジャーナル フリー

2005 年 11 巻 p. 261-266

詳細
抄録

Urban developments cause serious changes to watersheds conditions by decreasing storage area, introducing pavement and channeling. As a result, the peak discharge has been increasing and the arrival time of peak flow becomes early. The purpose of this study is to investigate the state of irrigation ponds in the Mikasa River watershed and to clarify flood control capacity of them. The result of investigation, the catchments area of all irrigation ponds was about 18%, the capacity of flood control was about 450,000m3 in the Mikasa river watershed. For the estimate of the irrigation ponds, we applied the distributed runoff model considering ponds effects about flood disaster in July 19, 2003. The result of calculation showed that the peak discharge at the Sanno Bridge decreased 20m3/s and arrival time of peak flow delayed by the irrigation ponds.

著者関連情報
© 2005 土木学会
前の記事 次の記事
feedback
Top