河川技術論文集
Online ISSN : 2436-6714
安室川における既設堰・ダム利用によるフラッシュ放流実験と自然再生の効果検証
浜野 直樹, 渡部 秀之, 瀧 健太郎, 眞間 修一, 関 基
著者情報
ジャーナル フリー

2006 年 12 巻 p. 259-264

詳細
抄録

Flushing release using existing weir and dam is one of the important measures of the 'Yasumuro River Nature Restoration Project' that is developed for river environmental restoration Thorea okadae can be exuberant.

In this study, field experiment was figured out to assure effect and possibility of flushing release using existing weir and dam. It is determined that this method would be one of the nature restoration measures. As a result of this study, following two conclusions were obtained. First, a certain effect was confirmed for dragging riverbed deposit material and peeling attached algae, while the maximum capacity of this measure is correspond to the second or third largest flush in a year. Second, it is detennined that appropriate operation of existing weir and dam would minimize the effect on the use of agriculture water.

著者関連情報
© 2006 土木学会
前の記事 次の記事
feedback
Top