2016年北海道豪雨における 九線橋被災メカニズムの調査と解析
井上 卓也サムナー 圭希加藤 一夫六浦 和明矢部 浩規清水 康行
著者情報
ジャーナル フリー

2017 年 23 巻 p. 37-42

詳細
抄録

Many bridges were broken due to a large channel change during the Hokkaido heavy rain in 2016. We investigated the damage situation of the four bridges (the Kyusen Bridge, the Chiroro Bridge, the Kobayashi Bridge and the Kiyomi Bridge) immediately after the flood. Then we analyzed the collapse mechanism of the Kyusen Bridge using a two-dimensional riverbed deformation model (iRIC – Nays2D).

According to the observation result, the bed height near the Kyusen Bridge rose about 2 m. This implies that sediment supply was large during the flood. The results of numerical simulations indicated that the river bank was eroded largely due to both of a large flow discharge and a sufficient supply of sediment.

著者関連情報
© 2017 土木学会