河川技術論文集
Online ISSN : 2436-6714
流木捕捉工の効率化に関する水理模型実験
成瀬 哲哉高野 剛吉﨑 寛士若林 善樹大和 則夫福元 秀一郎高﨑 秀一日高 暢彦立道 大伸渡邊 明英廣岡 篤
著者情報
ジャーナル フリー

2019 年 25 巻 p. 651-656

詳細
抄録

This facility plan is one of the project at the Ono River, Oita prefecture, a tribute of the Kagetsu River in the Chikugo river basin and related with the disaster of heavy rain in north Kyushu occurred in July 2017 that caused transport and accumulate of driftwood on bridges etc. In this study, the structure features such as position, shape or height of side overflow weir that can capture driftwood into catchment area efficiently was examined. It is found that there is a correlation between distributary rate and capture rate, so we aimed to increase distributary of water and driftwood into catchment area and drain water from catchment area efficiently. As a result, we shortened the length of upstream side bank between main stream and catchment area, replaced downstream side one into slit, and raised riverbed of main stream. The results show that the capture rate improved up to 50-70% from 10-20% on original plan.

著者関連情報
© 2019 土木学会
前の記事 次の記事
feedback
Top