砂防学会誌
Online ISSN : 2187-4654
Print ISSN : 0286-8385
ISSN-L : 0286-8385
報文
砂防えん堤施工時の渓床堆積横断面を活用した土石流発生直前までの伏流水流出変化,表面流発生プロセスの観測 ―三重県いなべ市藤原岳西之貝戸川での事例―
山田 孝森 健司沼本 晋也林 拙郎
著者情報
ジャーナル オープンアクセス

2009 年 62 巻 3 号 p. 30-38

詳細
抄録

Little is known about the actual situation of torrent bed scouring-induced debris flow generation, despite developing theoretical and experimental research. Herein we report subsurface flows discharged and spouted from cross-section of torrent bed material as well as overland flow generation by debris flow occurrence using an automated interval camera installed at the No.6 Sabo Dam construction site in the Nishinogaito torrent, Mount Fujiwara , Inabe-shi,Mie prefecture, Japan.
Subsurface flows spouted from cross-section of torrent bed material during heavy rainfall, and their volumes increased as the amount of rainfall increased. In addition, a lot of sediment spouted from several holes created at cross-section of torrent bed materia with a subsurface flow prior to debris flow. Serial camera-footage analysis revealed a time difference between overland flow and debris flow. Subsurface flows may travel in several pipes developed in debris flow deposits, and water can concentrate in pipes during heavy rainfall, resulting debris flow generation.

著者関連情報
© 2009 社団法人砂防学会
前の記事 次の記事
feedback
Top