Abstract
A Genetic Algorithm (GA) based reactive scheduling method has been proposed to modify the pre-determined schedules when operation delay occurs, in the previous research. The reactive scheduling method is extended, in the present research, to deal with the situation that the operation delay is detected just after the operation finishes.