Abstract
Under the diversified customer demands, introduction of mixed-model assembly lines is becoming popular to realize the small-lot-multi-kinds production. Since it produces various products on the same assembly line, a rational management is of special importance. With this point of view, this study focuses on a sequencing problem of mixed-model assembly line including a paint line as its preceding process. Then we have engaged in the multi-objective analysis under two objectives, i.e., to prevent various line stoppages and to reduce the volume of WIP inventory. We compared two methods like weighting method and PSA (Pareto Simulated Annealing) method to derive the Pareto optimal solution set. Through numerical experiments, we verified the validity of the proposed idea, and showed that the former method outperformed the latter.