Abstract
Actual operation at the local general hospital through a year was examined. As the result of the measurement, it is found the tendency of energy consumption gets somewhat different from one of the statistical data in literatures, caused by a change of hospital management, advanced building equipment system etc.. Condition of co-generation system consisted of gas engine generators and fuel cell was analyzed. More energy saving is expected to improve the usage of hot water in winter period effectively.