計測自動制御学会論文集
Online ISSN : 1883-8189
Print ISSN : 0453-4654
ISSN-L : 0453-4654
論文
予測残差補正による太陽光発電量予測および階層型BEMS
山内 賢滑川 徹
著者情報
ジャーナル フリー

2020 年 56 巻 4 号 p. 208-216

詳細
抄録

This paper deals with photovoltaic (PV) power prediction and building energy management system (BEMS) in multiple buildings. First, we consider PV power prediction. We predict PV power by using k-means method and SVR. However, there is an error between prediction and actual generation. In order to solve this issue, we estimate prediction error in advance by markov process and revise the prediction. And, by applying copula to calculated point prediction, calculate interval prediction. Second, we consider 2 level BEMS. At first level, in each building, power consumption is determined considering comfort. At second level, in order to reduce total cost in all buildings, battery scheduling is calculated with robustness by applying scenario robust theory. And, at the end of each section, simulation results show the effectiveness of proposed prediction method and energy management method.

著者関連情報
© 2020 公益社団法人 計測自動制御学会
前の記事 次の記事
feedback
Top